ES17 Certification of compliance of the investment project with the Energy policy long-term concept

Created on: 03.09.2015     Updated on: Thu Dec 17 13:55:37 CET 2020

The Ministry of Economy of the Slovak Republic (MoE SR) allows you to submit an application for issuing of the Certificate for construction of an energy facility pursuant to Act No 251/2012 Coll. on energy, and on amendment and supplement to certain laws. The Certificate for construction of an energy facility represents a documentation for planning proceedings and building permit proceedings. The Certificate is also a documentation for the application on connection of the facility for the generation of electricity to the transmission system or to the distribution system.
Within the service, applicants have the opportunity to request for issuing of the Certificate electronically. You can submit an application only in the Slovak version of the portal.

Administrative fees
The fee for issuing of the Certificate for construction of an energy facility:
  • Without installed power: EUR 1 000,
  • With installed power for each commenced 10 MW: EUR 1 000.
Note: The administrative fee for combined production of electricity and heat is determined on the basis of the installed electrical power of the facility.

Attachments
Submission of application for a certificate for the construction of an energy facility:
  • Investment project
  • Standpoints of the operators (distribution system, transmission system, distribution network, transmission network, pipes, other ...)
  • Standpoint of the Office (for facilities with power of 1MW)
  • Proving of professional qualification (for facilities with power above 30 MW)
  • Proving of experience (sworn declaration) (for facilities with power above 30 MW)
  • Parties to the proceeding opinions

Submission of application for a certificate for the construction of energy facility with combined production of electricity and heat:
  • Investment project
  • Standpoints of the operators (distribution system, transmission system, distribution network, transmission network, pipes, other ...)
  • Standpoint of the Office (for facilities with power of 1MW)
  • Proving of professional qualification (for facilities with power above 30 MW)
  • Proving of experience (sworn declaration) (for facilities with power above 30 MW)
  • Report on energy audit
  • Binding stance of a municipality
  • Parties to the proceeding opinions

Legislation
  • Act No 657/2004 Coll. on the thermal energy sector, as amended
  • Act No 136/2010 Coll. on services in the internal market, as amended
  • Act No 251/2012 Coll. on Energy, as amended
  • Act No 71/1967 Coll. on Administrative Proceedings (Administrative Code), as amended

Users

Business, Citizen

Manual

When using the service, please, follow this procedure:

  • Submit application for issuing of the Certificate for construction of an energy facility, or the application for issuing of the Certificate for construction of an energy facility with combined production of electricity and heat using an electronic form.
  • After the assessment of your submission, you will receive a decision regarding your application to your electronic mailbox (www.slovensko.sk).

Related services

 

Electronic service manual
Electronic manual [.pdf, 1,53 MB]


Service options


Submissions

 

Keep on reading or skip to main menu. Other possibilities: Go to Search or Footer.



 version 2.0.9

Up